- Client
Tersa Inc.
- Services
Industrial Design, CAD, Engineering
CONCEPT IDEATION

PROTOTYPING







CONCEPT DEVELOPMENT

OPTIONAL SCENT PODS
Simply pull the refillable water reservoir using the cut-away at the front to disconnect the magnetized hold. Fill the reservoir to the max fill line. Add a Tersa scent pod of your choice and seal the system using the rubberized plug fixed on top of the reservoir.
REFILLABLE RESERVOIR
Simply pull the refillable water reservoir using the cut-away at the front to disconnect the magnetized hold. Fill the reservoir to the max fill line. Add a Tersa scent pod of your choice and seal the system using the rubberized plug fixed on top of the reservoir.









